Equipment Bookings
On-line booking for HIGHBAYA
Booking Homepage |
Previous |
This Week |
Next |
Userlist |
MyBookings |
Overview
DATE | NTec AM | NTec PM | DC caster AM | DC caster PM |
|---|
Mon 01 Jul |
|
|
*LIME (BRUNEL) MOLTEN METAL - PHIL ENRIGHT 9.00 - 1.00 |
*LIME (BRUNEL) MOLTEN METAL - PHIL ENRIGHT 1.00 - 5.00 |
Tue 02 Jul |
|
|
*LIME (BRUNEL) MOLTEN METAL - PHIL ENRIGHT 9.00 - 1.OO |
*LIME (BRUNEL) MOLTEN METAL - PHIL ENRIGHT 1.00 - 5.00 |
Wed 03 Jul |
|
|
*LIME (BRUNEL) MOLTEN METAL - PHIL ENRIGHT 9.00 - 1.00 |
*LIME (BRUNEL) MOLTEN METAL - PHIL ENRIGHT 1.00 - 5.00 |
Thu 04 Jul |
|
|
*LIME (BRUNEL) MOLTEN METAL - PHIL ENRIGHT 9.00 - 1.00 |
*LIME (BRUNEL) MOLTEN METAL - PHIL ENRIGHT 1.00 - 5.00 |
Fri 05 Jul |
|
|
*LIME (BRUNEL) MOLTEN METAL - PHIL ENRIGHT 9.00 - 1.00 |
*LIME (BRUNEL) MOLTEN METAL - PHIL ENRIGHT 1.00 - 5.00 |
Sat 06 Jul |
|
|
|
|
Sun 07 Jul |
|
|
|
|
Mon 08 Jul |
|
|
*ENTECH (MOLTEN METAL) 130031 - PHIL ENRIGHT 9.00 - 1.00 |
*ENTECH (MOLTEN METAL 130031 - PHIL ENRIGHT 1.00 - 5.00 |
Tue 09 Jul |
|
|
*ENTECH (MOLTEN METAL) 130023 - PHIL ENRIGHT 9.00 - 1.00 |
*ENTECH (MOLTEN METAL) 130023 - PHIL ENRIGHT 1.00 - 5.00 |
Wed 10 Jul |
|
|
|
*SMALL MELT AREA (MOLTEN METAL) - IAN HUGHES 130023 1.00 - 5.00 |
Thu 11 Jul |
|
|
|
|
Fri 12 Jul |
|
|
*SMALL MELT AREA (MOLTEN METAL) - IAN HUGHES 130023 9.00 - 1.00 |
|
Sat 13 Jul |
|
|
|
|
Sun 14 Jul |
|
|
|
|
Processing Equipment in Highbay
Only authorized users should book this equipment: view HIGHBAYA userlist
Booking restrictions:
Access to highbay is controlled at all times due to safety consideration however
when liquid metal is being processed on any one piece of equipment the access to
other equipment is prohibited therefore the booking slots for these pieces of
equipment are textboxes in order that users can provide details about the
bookings and in particular identify the time windows during which other users are
likely to be unable to access highbay due to liquid metal processing. An example
booking is envisaged to be of the form:
e.g. 'NTec preparation and casting. Liquid processing between 11-12'
See bookings at https://external.materials.ox.ac.uk/research/booking.php?cmd=view&id=HIGHBAYA